Cost Comparison & Analysis
Typical Machine
Operating Cost Comparison
Manufacturer Model |
QVAC
PC Series |
Typical
"Cold Oven" Machine** |
|
|
|
|
|
Film |
.010 SURLYN* |
.010 SURLYN* |
Percent
Difference |
|
|
|
|
Production Required |
100,000 |
100,000 |
|
Number up |
1 |
1 |
|
Cycle time (seconds) |
17 |
50 |
66.00% |
|
|
|
|
Total Hours Required |
472.22 |
1,388.89 |
66.00% |
Total Days Required |
59.03 |
173.61 |
|
|
|
|
|
Labor & Overhead |
|
|
|
|
|
|
|
No. Operators |
1 |
1 |
|
Cost Per Hour |
10.00 |
10.00 |
|
|
|
|
|
Total Labor &
Overhead |
$4,722.22 |
$13,888.89 |
66.00% |
|
|
|
|
Energy Cost |
|
|
|
|
|
|
|
KW Required |
6 |
12 |
|
Cost per KW |
0.10 |
0.10 |
|
|
|
|
|
Total Energy Cost |
155.83 |
1,666.67 |
90.65% |
|
|
|
|
Total Machine
Operating Cost |
$4,878.06 |
$15,555.56 |
68.64% |
|
|
|
|
Your savings
$10,841.06 or
$173.46 PER
DAY. And, your operator has 114.58 days to do
other work.
QVAC PC Machines are self contained needing
only electrical hook up.
Cold Oven machines required air supply not
included in the price.
*SURLYN is a Dupont trade name.
**Such as Ampak, Visual
Packaging, Etc.
Skin Package Cost Analysis
Company |
Your Company |
|
|
|
|
QVAC Model: |
PC 1824 TP |
|
|
|
|
Film |
.005 SURLYN* |
|
|
|
|
Production Required: |
100,000 |
|
Number up |
5 |
|
Cycle time (seconds):** |
30 |
23.81 - 7 hour days |
|
|
|
Labor & Overhead |
|
|
|
|
|
No. Operators |
1 |
|
Cost per hour |
10.00 |
|
|
|
|
Total Labor & Overhead |
$1,666.67 |
|
|
|
|
Energy Cost |
|
|
|
|
|
KW Required |
6 |
|
Cost per KW |
0.10 |
|
|
|
|
Total Energy Cost |
55.00 |
|
|
|
|
Film Cost |
|
|
|
|
|
Film Yield/LB. |
6000 |
|
SQ. IN. per cycle |
520 |
|
|
|
|
Total lbs. required |
1,733.33 |
|
Cost per lb. |
$2.20 |
|
|
|
|
Total Film Cost |
$3,813.33 |
|
|
|
|
Total Card Cost |
$11,400.00 |
0.57 Master card cost |
|
|
|
Total Cost/Run |
$16,935.00 |
|
|
|
|
Cost per Package` |
$0.169 |
|
©2011 QVAC
|